Project manager path · free

Free rehab project manager training for home-buying teams

The project manager runs the rehab on houses the team flips or keeps: writes the scope, compares bids, approves changes in writing and finishes the punch list before the house is listed or rented. Some teams call this job rehab manager or construction manager.

The first level needs no sign-up. A free account saves progress after that.

6 levelsAbout 4.5 to 6 hours18 made-up people to practice withFree for a team owner and 2 reps

The levels

What the project manager path covers

Six levels, in the order the job teaches them. Each one is written for a stage of the job, from "week 1 as project manager" to "month 4 as project manager". Every level builds up to a boss round, the hardest one of that level. See how a level works.

  1. Level 1: Scope and bids

    About 45 to 60 minutesWeek 1 as project manager

    Three chapters, about 45 to 60 minutes, and you can stop after any chapter. A rehab goes the way its scope goes. Write what gets done room by room, get bids you can compare line by line, and tie every payment to finished work.

    What the lesson teaches: The scope is the job
    • Line items. Can you split it by room and trade, so I can compare it with the others?
    • Same scope. Your bid has no line for the gutters. Was that left out, or is it in another line?
    • Papers your team asks for. Before we book you, our team needs your papers on file. Can you send them this week?
    • A start date and a finish date. If we sign Friday, when do you start, and how many working days to finish?

    Rounds: Lesson · Watch a pro · Bid Sort · Deal file · Scope sheet · Calls · Boss talk · Lightning round · Level up

    Boss talk: Gord, The Half-Up-Front AskPractice first with Rudy and Faye.
  2. Level 2: On time, on budget

    About 45 to 55 minutesWeek 2 as project manager

    Three chapters, about 45 to 55 minutes, and you can stop after any chapter. Every rehab finds something. Walk the job every week, put every change in writing before the work, keep the budget current, and finish the punch list before anyone lists the house.

    What the lesson teaches: Surprises are normal. Silence is not.
    • See it yourself. Can you send me photos of the rot before you close the wall?
    • Price it in writing. Please write it up: the work, the price and the days it adds.
    • Get it approved. This one is over our limit, so the business owner signs before your crew starts it.
    • Update the budget. Change order 2 is approved: 3,400 and 2 days. The budget is updated.
    • Dates, not "soon." "Cabinets arrive Tuesday," not "they are on the way."

    Rounds: Lesson · Watch a pro · Site Walk · Deal file · Weekly update · Calls · Boss talk · Lightning round · Level up

    Boss talk: Hal, The Business Owner Who Wants It ListedPractice first with Lyle and Bree.
  3. Level 3: Ready to list or rent

    About 45 to 60 minutesWeek 3 as project manager

    Three chapters, about 45 to 60 minutes, and you can stop after any chapter. The last 10 percent of a rehab is where money leaks: a final payment made before the punch list is done, a permit nobody closed, a buyer's inspection list priced on a guess. Close the job so the house sells or rents clean, and the next estimate gets better.

    What the lesson teaches: A job is done when the papers say so
    • Walk the punch list together. Let's walk it room by room and check each item off together.
    • Final pay with the final waiver. Final payment goes out with your signed final waiver and the supplier waivers.
    • Close the permits. Can you send me the signed final inspection before we list?
    • Hand over the house book. The house book has the paint codes, warranties and the photos behind the bathroom wall.
    • Photos before the wall closes. Plumbing and wiring photos go in the house book. A future buyer or landlord will thank you.

    Rounds: Lesson · Watch a pro · Close-Out Desk · Deal file · Close-out report · Calls · Boss talk · Lightning round · Level up

    Boss talk: Simone, The Inspection Repair ListPractice first with Wynn and Ola.
  4. Level 4: Problems behind the walls

    About 50 to 65 minutesMonth 2 as project manager

    Three chapters, about 50 to 65 minutes, and you can stop after any chapter. Every rehab finds something: rot under the tub, wiring from another century, a leak nobody saw. The project manager who stops, looks, prices the fix in writing and tells people the same day keeps the budget honest. The one who closes the wall and hopes pays for it twice.

    What the lesson teaches: Stop, look, price it, tell them
    • Photo it before anything. Before anyone touches it, photos from three sides.
    • The right trade looks. Electrician can see it at 8 tomorrow. Hold that wall till then.
    • Price it in writing. Send me the fix, the cost and the days, in writing, before you start.
    • Tell people the same day. Found rot under the tub. Photos, a quote by tomorrow, likely three days.
    • Walk the demo yourself. The day the walls open, you are there, with a camera.

    Rounds: Lesson · Watch a pro · Surprise Desk · Deal file · Change order · Calls · Boss talk · Lightning round · Level up

    Boss talk: Magnus, Close the WallPractice first with Abel and Dorian.
  5. Level 5: Running two rehabs at once

    About 50 to 65 minutesMonth 3 as project manager

    Three chapters, about 50 to 65 minutes, and you can stop after any chapter. Two houses at once is where most project managers start losing days: a crew pulled to the other job, tile ordered for the wrong house, an inspection nobody booked. Keep one schedule for both, move crews on purpose, order ahead, and say plainly what a third job would cost the first two.

    What the lesson teaches: One schedule, two houses
    • One schedule. Both houses, one calendar, every trade on it.
    • Move crews on purpose. Only if house A's critical path doesn't slip.
    • Order on day one. Cabinets for both houses ordered this week.
    • Say what a third job costs. A third job now adds about a week to both of these.
    • Walk both houses every day. Or call both leads at the same time each morning. Ten minutes each.

    Rounds: Lesson · Watch a pro · Two-Job Desk · Deal file · Weekly plan · Calls · Boss talk · Lightning round · Level up

    Boss talk: Ferris, The Third HousePractice first with Tariq and Lacey.
  6. Level 6: When a contractor falls behind

    About 50 to 65 minutesMonth 4 as project manager

    Three chapters, about 50 to 65 minutes, and you can stop after any chapter. Every project manager meets the contractor who is nine days behind and says "next week, promise." Yelling doesn't fix it and neither does hoping. Find the real reason, write down what is done, pay only for finished work, get a catch-up plan with dates, and bring the business owner clear options before the house slips a month.

    What the lesson teaches: Facts, money, a plan
    • Dated facts first. Here's what I saw on the walk today, with photos.
    • Ask for the reason. Before we talk dates, what happened?
    • Pay for done work, fast. I'll walk it tomorrow and pay for what's finished the same day.
    • A plan you can check. Each task, its date, and a check on Friday.
    • Walk the job, or get a dated photo. Every day a job is late. Ten minutes, and it goes in the job log.

    Rounds: Lesson · Watch a pro · Crew Check · Deal file · Catch-up plan · Calls · Boss talk · Lightning round · Level up

    Boss talk: Rowena, Fire Him TodayPractice first with Dashiell and Honora.

The lessons teach general rules only and are not legal advice. A team can add its own call window and rules, and those show in every lesson.

Who you practice with

The people on this path

All of them are made up. Each one has a situation, a mood and a reason, and each reacts to what the rep says.

  • RudyThe One-Line Bid
  • FayeThe Next-Door Neighbor
  • GordThe Half-Up-Front Ask
  • LyleThe Rot Behind the Wall
  • BreeThe Listing Date
  • HalThe Business Owner Who Wants It Listed
  • WynnThe Final Check
  • OlaThe Rental Handover
  • SimoneThe Inspection Repair List
  • AbelThe 'Maybe Two Grand'
  • DorianThe Promised Date
  • MagnusClose the Wall
  • TariqThe Double-Booked Plumber
  • LaceyThe Week-Early Buyer
  • FerrisThe Third House
  • DashiellThe Contractor Who Fell Behind
  • HonoraThe New Tile Contractor
  • RowenaFire Him Today

Job tools

Two free tools for a project manager

They are for the work itself, between practice sessions. Each one opens in your browser with no sign-up and uses no AI.

Scope and bid compare

Line up contractor bids on the same scope and see gaps and missing lines.

You put in
The scope of work, one line for each piece (up to 20 lines), and what each contractor charges for each line. It compares up to three bids.
You get
A total for each bid, a flag where a contractor left a line without a price, and a flag where two prices for the same line are far apart. The cheapest bid gets a Lowest full bid mark, and only a bid that priced every line can get it.

Open the toolHow it works

Payment schedule by stage

Stages, what counts as done, and what is paid after each check.

You put in
The contract total and the stages of the job. It starts with five stages, each with what counts as done and a percent of the total, and you can change them.
You get
The amount to pay after each stage is checked, and a warning when the stages do not add up to 100%. It prints.

Open the toolHow it works

For the rep

  • A level takes 45 to 65 minutes, on a phone or a computer
  • Boss rounds can be replayed on easy, normal or hard
  • Each pass adds to a skills record, with a link anyone can check
  • A 3-minute drill every day, with moments from this job
  • A keep-sharp round once a month after the last level: one boss round on hard
What a rep gets

For the people who run the team

  • Every level a rep passes shows on the rep table
  • The Ramp Report gives each rep a status and a next step
  • A team lead can assign a level with a due date
  • The huddle cards start with what the team missed most
  • The team board flags a rep who has not practiced for 14 days
What the business owner sees

Questions

About a project manager's training

Ask about rehab and projects in the community

How do I train a rehab project manager for flips?

Start with the scope, because the job goes the way the scope goes: what gets done in each room, to what level, and what is not in the job. The free project manager path has 6 levels: "Scope and bids", "On time, on budget", "Ready to list or rent", "Problems behind the walls", "Running two rehabs at once", and "When a contractor falls behind".

How do I compare contractor bids on a rehab?

Ask for the price by room and trade, with a start and a finish date, and a price range for anything nobody can see yet, like behind a wet wall. A low bid often leaves something out, so check each one against the same scope.

How should change orders work on a rehab?

See it first, get the extra work, the price and the days it adds in writing, get it approved by whoever your team says signs off, then let the work start. Put every approved change on the budget the same day.

Is a project manager the same as a rehab manager?

On many teams, yes. Titles change from team to team, and the same work also goes by construction manager. This path follows the work: it is for the person who runs the rehab on a flip or a rental.

Does Climbmark have free tools for a project manager?

Yes, two: Scope and bid compare and Payment schedule by stage. Each one opens in your browser with no sign-up and uses no AI. See what each one asks for and gives back.

Start the project manager path

"Scope and bids" takes about 45 to 60 minutes and needs no sign-up.